Air Filter RFQ and Purchasing Guide: Building Comparable Quotations

HOME Air Filter RFQ and Purchasing Guide: Building Comparable Quotations
Air Filter RFQ and Purchasing Guide: Building Comparable Quotations
  • Publish Date: 06.10.2026
  • Modified Date: 08.11.2026
  • Author: Safe Air

Two quotations for the same filter name may cover different supplies. One can include a gasket while another prices only the element. Comparable quotations start with one request document, issued to every supplier at the same revision.

This guide covers the request itself, the extra data a gas-phase filter needs, how to keep specifications straight across several sites, and how to close a sample review before releasing repeat orders.

List the site, air handling unit reference, filtration stage, existing part number, outside dimensions and quantity. State the dimension order as width x height x depth and use mm. A photograph of the old label helps identify the element, but measuring a worn filter does not replace an approved installation drawing.

State the filter class together with its standard. Explain whether the design airflow applies to each filter or the whole unit. Any requested initial pressure drop must have a corresponding airflow. For a legacy classification, request relevant test evidence rather than assuming an exact conversion to a newer standard; the relationship between older and current filter classes is not a fixed one-to-one mapping.

Include frame material, gasket position, seating surface, flow direction and the housing drawing where available. Record delivery address, requested date, packaging, split deliveries and quotation validity separately. A requested delivery date becomes a commitment only when the supplier confirms it.

Leave unknown fields clearly identified. Ask suppliers to list assumptions and technical deviations. If the class is known but the seal geometry is missing, make drawing approval a condition before ordering. Compare the confirmed technical scopes first, then assess price and delivery. This keeps an apparently attractive offer from hiding an unresolved interface.

Field example. When a unit contains four elements, record total airflow and airflow per element separately. If the seal is unknown, request the housing drawing instead of writing that the filter is suitable for the existing unit. This is a method for closing an information gap, not a product performance specification.

An odour complaint is a starting point for gas-phase filter selection, not a specification. Similar odour descriptions can represent different contaminants and loads, so a request for an activated carbon filter has to identify the substance and the operating conditions as clearly as the available evidence permits.

Where known, give the gas or vapour name, measured concentration and measurement method. Separate average levels from short peaks. If only an odour description exists, say so rather than inventing a concentration. Explaining the source process helps the supplier identify what is missing.

Record airflow, operating hours, temperature and relative humidity range. These conditions and the gas challenge together affect adsorbent evaluation. Describe the existing particulate prefiltration and the available installation space. A particulate filter class is not a measure of gas-removal capacity.

Provide any required outlet concentration or reduction target together with the measurement conditions. Ask for the proposed adsorbent type, media quantity, operating limits and calculation assumptions. A generic product description is not a performance guarantee for a particular gas challenge.

Differential pressure is not a direct measure of remaining gas-removal capacity, so carbon replacement needs suitable performance monitoring and product instructions rather than a pressure reading. Clarify whether the offer covers complete elements or media replacement, and who performs the work.

Field example. A process may create a high gas load only at shift start, and the daily average will miss that event. Include peak duration and the available measurements. Where data is missing, keep the gap visible instead of recording an assumption-based estimate as guaranteed service life.

Combining filter purchases across several sites simplifies administration. Similar product names or identical face sizes do not establish identical technical needs, so a central purchasing list has to preserve each site approved installation and performance requirements.

Give every line a site, unit, stage and approved revision reference. Do not merge elements that only look alike: compare class, airflow, frame, gasket and depth, and keep differing items separate unless the technical team records its acceptance of the difference.

Add revision number, date and change explanation to the master list. Define how updates reach buyers and maintenance teams so competing copies do not circulate. A supplier part-number change is not necessarily a specification change; keep the altered field and its reason visible.

Do not bury an alternative frame, seal or class in a general acceptance statement. Record the affected line, proposed change and decision owner. An alternative accepted at one site should not automatically apply to another, and approval should refer to the particular unit and its operating conditions.

State quantity and identification requirements for each delivery address, and make receiving records reference the correct order line. Before redirecting surplus stock to another site, verify technical compatibility. Linking the shared list to receiving and maintenance history stops the same uncertainties reappearing on the next order.

Field example. Two sites use identical sizes, but one seals on the inlet side and the other on the outlet side. A merged item causes a wrong delivery. Keep the technical lines separate even when commercial discussions are combined, preserving unit mapping and shipping labels.

Installing one sample in a housing does not approve every future supply. Sample review applies to a defined product, drawing revision and operating condition. Before repeat purchasing, record what was checked and which issues remain open.

State part number, drawing revision, quantity, class and requested documents, and identify the unit used for the trial. Confirm sample charges, shipping terms and timing separately. This workflow describes the buyer-side method; it does not imply that samples or a particular lead time are available for every product.

Check outside dimensions, depth, seal position and frame condition first. Then assess seating, retainer compatibility and maintenance access. Do not force an element into place. A successful fit does not establish the filter class and does not prove the installed system integrity, which is a separate system-level question.

Match agreed reports to product identity, and conduct any required site acceptance checks under the applicable procedure. Record measurement conditions and methods. Do not describe a visual inspection as performance testing; each result should have a clear basis.

Identify the accepted part, drawing, deviations and approving person. If issues remain, state the conditions for repeat-order release, and include how later product or material changes will be communicated and reviewed. Approval then rests on a reusable technical record rather than a sample photograph or an informal recollection.

Field example. A sample passes dimensional and seating checks, but an agreed report is still missing. Record fit accepted with document acceptance open, rather than approved. A limited statement prevents the next order being released under a broader scope than the review supports.

  • Site, unit reference, filtration stage and airflow per element.
  • Class with its standard, outside dimensions in mm and the installation drawing.
  • Frame, seal position, quantity and required documentation.
  • For gas-phase requests: target gas, measured concentration, temperature, humidity, operating hours and acceptance basis.
  • Controlled technical revision, with line-level deviation approval.
  • Delivery address, receiving reference and declared deviations.
  • Sample identity, drawing revision, and what remains open at approval.

Send the manufacturer the dimensions, requested class, airflow per element and quantity. Identify missing information so assumptions can be reviewed explicitly, and confirm product and document scope during quotation review. Where a drawing-based or non-standard element is involved, custom-size manufacturing and the questions to settle beforehand are covered separately.

Request a technical quotation · Our air filter manufacturing in Turkey · Catalogues and technical documents

Frequently Asked Questions

Usually not. The same part number can describe different frames, seal positions or depths depending on the supplier and the revision, and a worn label may belong to a superseded item. Send the part number together with outside dimensions in mm, class with its standard, airflow per element, quantity and the installation drawing or seating detail.

Yes, provided the gaps are marked as open rather than estimated. Ask suppliers to list their assumptions and technical deviations so the offers can be compared on the same scope. Where the class is known but the seal geometry is not, make drawing approval a condition before ordering instead of recording an assumption as a confirmed requirement.

Related Categories:

Search...

Safe Air

Safe Air

Safe Air is a Turkey-based manufacturer of HEPA, ULPA and industrial air filters, offering custom-sized and OEM filtration solutions for international industrial applications.

View Profile

Continue Reading